uncrating Mute Also, installation of a new een tral sterile supply facility, pro viding equipment for the prepara tion of sterile packs and instru ments for operating rooms, sterile trays for the various floors and bandages and dressings for gen eral use. Also, opening of the new operat ing suite, containing two major operating rooms, a sub-sterli/ing room, work room, st irage space for instruments and supplies, a fracture room and a minor sur gery room. and two recovery rooms equipped with oxygen and suction facilities vital to the treatment ; f opcraticc emergen cies. « Mr. Stubbs also noted that the second floor was given a thorough face-lifting with paint and new asphalt tile flo ring. The year al-o saw significant progress in the i roblem of patient financing, with such methods as insurance, iContinued < n Pane 7 '

54.0%