Much ol the meeting of tile Farniville Town Council Tuesday was taken by a report and dis cussion of the sewage treatment lagoon led by Town Manager L. Z. Jdfen.ston. The town office has been busy this month confering with their Lynchburg engineering firm and members of the Virginia Water Control Board on details of the proposed sewage lagoon. Analysis of the sewage content oi the west end line is being made to determine the size, design, lo cation. etc., of the first lagoon. The first lagoon, estimated to re quire some three to five acres will take the sewage that is now being emptied into the Buffalo River. Johnston reported that no loca tion lias been selected, and that further study will be made before buying tlie necessary land. Some of the economic considerations arc costs of the sewage line, cost of the land, construction costs, whe ther dikes will be needed, etc. These factors must be determined and tlie proper balance between cost and effective service reached. The second lagoon will pick up the sewage from the other sewage lines now emptying into the Ap pomattox River. The council authorized the use of the electric speed tuner device
58.2%Friday, April 12, 1957 — The Farmville herald and farmer-leader · Page 1
Council Continues Study of Sewage Disposal Lagoon At Tuesday Meeting
You’re reading Friday, April 12, 1957 — The Farmville herald and farmer-leader.
Citation & transcription details
Cite this article
“Much ol the meeting of tile Farniville Town Council.” Farmville Herald, April 1957.
“Much ol the meeting of tile Farniville Town Council.” Farmville Herald, Apr 1957.
About this text
OCR from one source block. Related blocks and story continuations may be separate records.
The reading heading comes from the preceding headline block, aligned directly above this text on the scan. This is a layout-based association; the source records remain separate.
Page 1 · column 4 of 9.
Machine transcription · vendor-alto
OCR source: vendor-alto
58.16% mean segment confidence