Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 1 · column 5 of 5 · from the scan, no model involved

Bridge construction costs have increased 150 per eent since the ~ start of World War II, Glidden pointed out.
The largest of the secondary1 bridges built by the highway department during the 1051 calendar year in Rappahannock was a 40foot structure over Battle Run on Route 008. In addition to the 7 new bridges built, repairs were made on four bridges, Resident Engineer Worthington said.
There were 10 miles of secondary roads in the county given an allegeather surface with mttfrfliitofi atone by the highway department, which also sought to strengten many roads following tile Spring break-up period.
While facing a serious problem of sufficient personnel, the highway department in 1952 hopes to continue to replace many of the inadequate bridges and to stabilize as many of the roads in Rappahannock County as funds will permit.
-HJanuary
15 Deadline
On 1951 ACP Reports
Farmers of Rappahannock who still have not made a report of practices carried out under the 1951 Agricultural Conservation Program have less than two weeks left/ H. S. Barksdale chairman of the PMA county committee, repeated that Tuesday, January 15, is the last day on which the county office may accept reports of 1951 performance.
48.0%