Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 1 · column 3 of 5 · from the scan, no model involved

and didn’t realize it required all this kindergarten.”
The Supervisors received five bids for covering the old dump at Amissville. The job will consist of three phases — clearing and covering the area with dirt, grad,,;ing an^l leveling and finally reseeding.
Canton Construction Company of Amissville bid $3,100, for each phase of the job. H.E. Parrish of Centreville bid $3,800 for the whole job, provided the dirt to cover the dump was available-on site. James Li Atkins of LeeHigh Construction
Company of Washington bid $5,250 for the entire job. Eagle Construction Company of Manassas bid $5,500, but noted it would cost extra if they had to bring in additional dirt. William A. Hazel of Fairfax bid $8,900 for the entire job.
The Supervisors were confused about the Canton Construction Company bid. They weren’t sure if
94.5%