Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 1 · column 7 of 9 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

The Rappahannock County Board of Supervisors received a report on roads and schools, in addition to other business transacted at the regular September meeting held Friday at the courthouse.

Resident Engineer James Skeens reported that work on the road between Amissville and Viewtown would begin before the end of this month. This will be primarily clearing, grading and culvert

| construction. He stated that no asphalt would be applied before spring, since it would take some time to get the road in condition and cold weather was not conducive to. good asphalt application. i lie also stated that a final field inspection had been made of I he | proposed dual laning of Route 211 at Amissville and a preliminary j field inspection of that road made > at Sperry ville. He said at Amissville (the second lane would definitely | parallel the present road on the ! north side. With the final field inspection completed, the next step would be right of way {acquisition, however, this will not

59.0%