Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 8 · column 3 of 5 · from the scan, no model involved

IN FAUQUIER, by contrast, a small “regional” system linking Hie Plains and Marshall, via lines running through undeveloped countryside, has already been built, and county officials are pressing for another regional system covering a much greater area, linking Catlett, Calverton, Midland and Remington. Even the Water Control Board is balking at the latter project, insisting on a much smaller initial project.
In Prince William, the monster of all regional sewer systems is under construction for the Upper Occoquan Sewer Authority. The eventual cost of this plant, ac
95.5%