Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 2 · column 7 of 9 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

of Washington be left intact after this section of the road is by-passed with new dual lane construction in the future. Chairman J. Newbill Miller was upheld in his statement that he could not see the wisdom of removing the bridge as had been planned by the Highway Department when it was adequate for many years of service. The traffic load would be greatly reduced and would be of utmost convenience to those with property on the road. This short section can be transferred into the secondary system, but the final decision comes from the Highway Department. A new dump site in the Sperryville area was investigated with approval for purchasing if deemed satisfactory for this use. A former area near Sperryville which had been considered was found tied up in a road right of way tangle so a proper access was not avail

93.8%