Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 1 · column 4 of 5 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

part-time editor and materials to publish a school system newsletter, and $500 to do FBI background checks of new employees.

The school system has contracted with D. Gibson/LA Restoration to replace the roof over the elementary school gym and cafeteria fot $60,000. The new roof covering will be a lowsloped metal roof over tapered insulation. .The job is expected to take 30 days and be finished .before the start of school next year, Dr. Gangei said. ;

After learning that 34 percent of high schoolers and 29 percent of students at the elementary school were absent from school on Memorial Day, the board voted not to use Memorial Day as a snow make up day in the future.

93.2%