Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 7 · column 6 of 9 · from the scan, no model involved

provide a single two-lane roadway with grade intersections and provisions for future interchanges ;ind a parallel roadway. A connection from the present roadway lo the bypass will be provided at Secondary 666. The Arterial 207 project in Caroline County will complete the parallel road work between Interstate 95 at Carmel Church and the Potomac River except the western section of the Bowling Green bypass and a bridge across the Rappahannock River at Port Royal.
A project in York County will extend the parallel roadways of Magruder Boulevard in Hampton to Arterial 17 at Tabb. A project at the Charlottesville Arterial 29 bypass is designed to improve local movement of traffic north of the US 250 interchange.
At Norfolk and Alexandria, urban street improvements are being undertaken through the TOPICS program This program makes available federal matching funds for improvements to existing streets that will improve the traffic carrying capacity and
81.0%