Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 2 · column 3 of 4 · from the scan, no model involved

one of VEPCO’s nuclear plants because the engineers had “underestimated” the pressure. This kind of technical error is evident continuously throughout the whole program. If steam valves, pipe welds, control switches, relays and even emergency systems cannot be designed to be fail-safe, then at this point it seems presumptuous to smugly assume that the problems with the radioactive material itself will simply solve themselves with the application of more research money. This is quite a gamble.
Further, it may be asked why, if these problems are so easily solved, the nuclear industry has protected itself from any liability
93.5%