Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 8 · column 3 of 9 · from the scan, no model involved

dams, which protects the dam by preventing the water from going over the top and causing major damages. During Hurricane Agens, about 20 SCS dams in Virginia had emergency spillway flow.
“We contribute the success of our dams to: competent and thorough engineering investigations of proposed sites; designing each dam to the requirement of specific sites; our meticulous inspection program during construction; and possibly the most important factor, the operation and maintenance of the dams,” states Grimwood.
Before SCS agrees to construct a dam, the local people—project sponsors—must sign an agreement consenting to operate and maintain the structure for safety.
The first three years after construction are considered a critical establishment period. During this time, SCS personnel help the sponsors
96.4%