Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 1 · column 7 of 9 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

over 24 hours in some locations.

Highway crews battled through the night and morning to keep Routes 211 and 522 clear as gusts piled snow back over the two primary highways. Once the winds settled, secondary roads were attacked with plows. Late Monday afternoon, assistant resident engineer Doug Bywaters said he expected to have all paved and gravelled roads in the county plowed by midnight.

Sunday’s new snow fell on a layer of old snow from last week’s storms that had been packed down on roadways like a sheet of ice, forcing schools to close from Monday morning through Friday.

According to resident highway engineer Don Askew, below normal temperatures interferred with normal melting that should have cleared secondary roads after plows took off all but an inch or so of snow. Despite

93.2%