Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 5 · spans the page · from the scan, no model involved

Over 15% of the proposed budget increase is for maintenance that can no longer be postponed: - Replacing the elementary school's boiler. - Correcting dangerous problems with the elementary school’s electrical system. - Continuing to remove asbestos from our buildings. • Failure to address postponed maintenance puts our buildings and the safety of our children at risk and costs more down the road. Again you pay the bill
95.7%