Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 3 · column 2 of 7 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

upgrade for the elementary school ($659,000);

• An upgrade of the high school’s track and athletic field ($446,000);

• An auxiliary gymnasium for the high school ($787,000);

• Classroom additions for the elementary school ($488,000), plus architect fees, contingencies and testing ($344,000).

lb the muffled toots of a sousaphone and trumpets down the hall, Chappell paced the carpet in front of the seated supervisors like a teacher lecturing on the subject of Need. He stressed that the first five items on his list were “improving facilities, not an expansion,” as he referred his audience to a well-prepared statistical PowerPoint presentation on a lighted screen.

Arguing for the auxiliary gym, he said, “We don’t have space for what we already have.” His bottom line? “If we cut anything (from the list,)* we’d hope that the (elementary school) addition would be the only thing.”

Several School Board members, including Ken Marlor, reit

92.9%