Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 3 · column 4 of 6 · from the scan, no model involved

Washington. An interior road will be built to VDOT standards. Between 3-4 acres of land will be disturbed by the development. An erosion and sediment control and stormwater management plan will be adhered to, the plan having been approved by the Culpeper Soil and Water Conservation District. A stormwater dry pond receiving collected rainfall and snowmelt will control bank runoff so that it can seep back into the ground over time.
This winter or next spring, residents will be able to observe how a drainage system is implemented in Sperryville. Great care has been taken by VDOT to preserve the historic character of the village, working within a very narrow roadway. Runoff from the 50-foot high hill
See RUNOFF, Page A8
95.5%