Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 3 · column 2 of 6 · from the scan, no model involved

because “most plants in the state had the same problem.” However, the Sperryville sewer plant is not supposed to be receiving rain water, and the problem of finding out how the rainwater is getting into the system and figuring out how to keep it out remains.
She said also she is unable to turn the blowers off at all because within one minute of the time the blowers are turned off the system peaks at 100,000 gallons. Environmental Systems Services of Culpeper, which operated the plant from last July until Ms. Chabot was hired has recommended a modification at the plant which will cost approximately $5,000 to fix the problem, but WSA members want to try a less expensive fix first.
96.8%