Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 8 · column 6 of 6 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

snare drums.

Gangel presented a list of unanticipated repairs from July 15 to Nov. 11 that totaled $23,708.15. Items related to the modular units repairs totaled $5,670.37. Included were $1750 for chemical service to the RCES cooling tower and $2,042.87 for the RCES cafeteria water/cooling tower service; $3,818.27 for cafeteria,; teacher’s lounge and RCES air conditioning and heater blower motor; and $1,354.34 for the school board office air conditioning and heater.

Tole said he is trying to identify community groups he can engage to help develop a vision for the schools. He mentioned the possibility of hiring a lobbyist in conjunction with several other counties and including students in a visit to the state legislature.

The RCES roof was repaired and the leaks are apparently corrected. The' RCHS roof hatchway is being completed and the RCHS ceiling insulation is completed.

87.8%