road in same general area as No. 7. Flooding creek washes away roadbed and strands property owners. Paving required. Projected start date Fall 2001. Projected end date mid-2002.

No. 23a: Old Hollow Road from 1.59 miles west Route 600 to 1.62 miles west Route 600 (.03 miles long). Reconstruct approaches to Route 612 bridge. Moderate funnel- shaped widening required to blend into existing road and provide working room for crews.

No. 23b: Old Hollow Road bridge over Thornton River. This is a school bus route affected by flooding. When bridge is • impassable, the only other way! into/out of hollow is extremely' long. Bridge has engineering safety rating of60.40 out of possible 100 and continues to deteriorate. VDOT looking to completely rebuild with a precast; concrete deck and beams. Seethrough handrails will help keep rustic appearance.

Projected start date for both projects Fall 2001-. Projected end date for both pro- • jects mid-2002.

No. 26: Fletcher’s Mill Road; from .1 mile east Route 655 to2.2 miles west Route 620'. (approximately .05 miles); Reconstruct approaches to bridge on already-paved road. Flooding causes trash and fallen trees to build up around! bridge. This forces water over; the bridge. There have been" fatalities. No engineering plan. 1 VDOT will start assessments' within 12- 24 months. Project start and ending date 2003.