Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 4 · column 7 of 9 · from the scan, no model involved

request the supervisors to < begin construction of ex- i panded facilities at the i elementary school in two to three years. At Masterson’s i suggestion, space needs there I will be reviewed annually in < light of mandated special i programs that may require < building to begin sooner.
In addition, the board voted four to one with Stokes opposed to use the high school’s new modular units at the elementary school when they are no longer required at ‘
RCHS. j
The board also agreed to \ reevaluate the location of the new bus shop. The State 1 Water Control Board recently indicated that the proposed site next to the sewage treatment lagoon would be unacceptable because run-off from the buses would flow into the lagoon. Masterson reported, however, that county engineer Fanning Baumgardner felt the shop could be built next to the lagoon without interferring with sewage treatment.
Masterson and Stokes were appointed to servt ojj a bus shop committee . %ifn * Bloomer and assistant superintendent Rob McDaniel. The committee is to check with highway department personnel on the possibility of reaching a settlement on right-of-way before construction of widened Route 211 takes the current shop site. The board postponed setting a time frame for building the new
88.9%