Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 3 · column 4 of 7 · from the scan, no model involved

elude a margin of safety, which is supposed to account for any uncertainty associated with estimating the pollution limits.
Once a TMDL study has been completed, an Implementation Plan (IP) should begin. An IP is a document required by VA law detailing the type of pollution control measures needed to clean-up an impaired water body. In response to the CWA, the Virginia Department of Environmental Quality (VA DEQ) has listed as “impaired” 16 stream segments in the Upper Rappahannock River Basin not meeting state water quality standards.
Starting on October 4th, 2006 at the Mt. Nebo Church in Rochelle, VA, a series of public meetings will be held throughout the Rappahannock River Basin to discuss these upcoming TMDL studies. Engineering Concepts, Inc located in Fincastle, VA is the organization in charge of drafting the TMDL studies.
Additional public meetings to follow will be at the Rappahannock County Lib
94.7%