Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 1 · column 1 of 6 · from the scan, no model involved

it By DAPHNE HUTCHINSON
F “Unusable.”
I That’s the conclusion from Hurt | and Profitt Inc., the engineering % firm that conducted soils tests on p two pieces of property under considf eration as possible sites for a sani| tary landfill.
Acceding to a report received ^ by zoning administrator John Me* : Carthy on Jan. 30, preliminary soil boring were made at the Lee property
off the Fodderstack Road near the Town of Washington and the Saltonstall tract off Route 622 at the foot of Aaron Mountain.
“Based upon the population of Rappahannock County and the amount of solid waste generated per year for a landfill site, we have estimated
the life expectancy of Site 1 (Lee) and Site 2 (Saltonstall) to be 1.5 and 3.3 years respectively,” the report states. “We consider a suitable sanitary landfill site economically feasible when used for a minimum of
ten years. Therefore, we do not recommend Sites 1 and 2 as usable.”
There was no discussion of the report at Monday’s board meeting. Allen Olsen, a landowner on the Fodderstack Road, was there to monitor landfill developments. In response to Mr. Olsen’s request for a copy of the report, zoning adminis
79.2%