Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 1 · column 2 of 9 · from the scan, no model involved

The public statement of expected cost led board members to speculate on whether the declaratory judgement action would still be necessary.
The new plans specify a Butler pre-engineered. low rigid metal building or a building by another manufacturer that could meet the same specifications.
Baughan said that the general contractor would be either the building manufacturer who would subcontract the interior work; or a contractor who would do the interior and subcontract the preengineered shell.
"This is your basic, nofrills building," he said.
The site proposed by the architects is behind the existing bus shop, facing slightly east. An access road is proposed running parallel to route 211 through what is now the rear half of the bus shop.
In answer to other questions, Baughan told the board that he would assist in the approval of bidders and would prepare an invitation to bid to be released soon.
66.3%