Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 1 · column 2 of 9 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

offered the board several changes in the original plans that would reduce the building cost.

After a brief discussion of the changes, the board voted to accept the low bid, pending changes to the contract price reflecting alternatives recommended by the architect.

The major change voted by the board was to eliminate the requirement for double prime and seal to the bus shop parking lot, a savings of S8.000.

Other changes were eliminating soil treatment for termites at S39S; deleting curbing and sidewalks for $2200; substituting local gravel with a 2” bluestone surface for $1500; changing the windows to a less expensive kind for $1200; deleting the water filter for the well for $135? relocating the electrical panel from the garage to the parts storage

95.7%