Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 1 · column 2 of 6 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

“Project.” They provided a detailed breakdown of the costs involved in the expansion of the high school, site improvements for the new athletic fields, replacement of the electrical distribution system, replacement of the oil boiler, architectural and engineering fees and bid document printing.

The school board estimates the new classroom addition for the high school (which will be 17,000 sq.' ft.) will cost $1,914,750. This addition will include: five classrooms, one building trades lab and yard, two science labs, two computer labs, a band/music room, a faculty work room and restrooms.

Costs for other improvements at the high school site are listed as: a physical education softball field, $40,000; expansion of student parking,

96.3%