Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 4 · column 4 of 6 · from the scan, no model involved

ed volume, lifespan, pollution, and cost. Several different types of drain fields were explored and soil engineering firms tested a number of areas. The soil had few areas with adequate space to sustain the flow of waste water from the town and all drain fields will ultimately fail, usually in 15 to 30 years.
The question of purity requirements depends on the decisions of the Dept, of Environmental Quality (DEQ). The Town of Washington desires to discharge treated waste water of the highest level of purity or at the “Limits of Technology” (LOT). We understand that this will result in a lower level of pollution than the Rush River now contains and will be a higher standard then is required for the Sperryville system. Cost will be determined when we know what specifications we will be required to
90.7%