Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 1 · column 2 of 6 · from the scan, no model involved

By SHARON KILPATRICK
Rappahannock New* Staff Writer
The sewer committee of the Town of Washington met with Charles Swanson, field services engineer with the division of wastewater engineering of the Health Department, last Wednesday to explore the possibility of building a sewer system for the town.
The next evening the county’s Water and Sewer Authority learned that the Spenyville sewer plant is again in violation of various requirements of the Department of Environmental Quality and the matter has been referred to the Office of Enforcement and Compliance Auditing.
Mr. Swanson described various methods of treating sewage. He said if the town is required to remove phosphorus from its discharge, it could be very expensive. Typical requirements that go with a wastewater discharge permit require treatment to limit biochemical oxygen demand (BOD) and total suspended solids (TSS) and con
95.3%