Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 5 · column 3 of 6 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

peak demand is expected to increase by 4,000 megawatts.

• The average annual growth rate for Dominion between 2007 and 2017 is expected to be 1.9 percent compared with 1.6 percent across the PJM system.

The PJM news release can be accessed at: http://www. pmewswire.com/news/index_m ail.shtml?ACCT=104&STORY= /www/story/01-16-2007/ 0004506865&EDATE=

The PJM 2007 Load Forecast Report can be accessed at: http://www.pjm.com/plan ning/res-adequacy/downloads/ 2007-load-report.pdf

91.3%