Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 8 · column 5 of 6 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

and spring. These semi-annual inspections are made by equipment technicians, people who are regularly involved in the maintenance and repair of this specialty equipment. Looming mechanical problems are caught early. Opportunities for equipment to be out of service when most needed are reduced.

Highways in Rappahannock County are maintained by the VDOT’s Washington Area Headquarters which has 21 personnel available for snow and ice control.

These VDOT personnel are responsible for clearing a total of 168 lane miles of primary roads that include U.S. 211 and 522, and Route 231 and 436 lane miles of secondary roads. (One mile of a two lane road

95.5%