Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 6 · column 1 of 7 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

.uunng the meeting, Herb White of WW Associates told the council that the geotechnical report on the proposed site for the wastewater facility came in favorable. He called the report “typical,” and said there does not seem to be a lot of rock under the site.

White reminded the council that 5 to 10 percent of the budget for the wastewater project is for unforeseen costs that arise during the project.

Council Member Claudia Mitchell asked White about the possibility of upgrading the town’s Water pipes at the same time crews have roads torn up to install the wastewater collection system.

“Most of the system we have is old,” Mitchell said. “I really think we need to be proactive about it ”

White agreed with the suggestion, as it would prevent

84.7%