Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 16 · column 6 of 9 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

SECTION III REMOVAL. --The fee to move a buildingor structure from one location to a new location shall be at the same rate as new construction, according to use group SECTION IV PLACEMENT OF MOBILE HOMES The fee for placement inspection of mobile homes shall be Fifty Dollars ($50 00) SECTION V DEMOLITION A fee of Twenty Five Dollars ($25 00) shall be charge for a permit to demolish any structure A Performance Bond, as prescribed by the Building Official, shall be posted prior to issuance of the permit, such bond shall be returned to the permit holder upon satisfactory completion of the work SECTION VI. MISCELLANEOUS FEES. A For each new electrical, plumbing, mechanical or structural inspection required as determined by the Building Official for any construction, alteration or enlargement of any structures not expressly covered by the foregoing, the fee shall be Thirty Five Dollars ($35 00) per inspection required B.The Building Official may also assess a fee of Thirty Five Dollars ($35 00) for each call-back inspection in the event any structure or portion thereof requires a reinspection

87.1%