Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 11 · column 8 of 9 · from the scan, no model involved

The Slate Water Control Board has under consideration an issuance to the following NPDES Permit and State Certificate
Facility Name & Location Rappahannock
Group Home
Name of Permittee Samuel D
Snead
Permit No VA0068039
Permittee Address Rt 1 Box
345 Washington. VA 22747
Flow 0 012 MGD
RECEIVING STREAM Rush
River Rappahannock River Basin.
Section 4. Class III. Special
Standard q
Discharge Proposed Municipal
Discharge The discharge is a result of the owner s treatment of waste The proposed issuance consists of issxjing the NPDES permit for the continued discharge of treated sewage effluent from this facility The proposed issuance is tentative On the basis of preliminary review and application of lawful standards and regulations, the State Water Control Board proposes to issue the permit subject to certain conditions These proposed determinations are tentative
PROCEDURES FOR THE
FORMULATION OF
FINAL DETERMINATIONS Persons may comment in writing to the Board on the proposed issuance to the permit within 30 days from the . date of this notice Comments shall include the name, address and telephone number of the writer and shall contain a complete concise statement of the factual basis for the comments. Orly those comments received within this period will be considered by the Board. The Board may. upon request or upon its own motion, decide to hold a public hearing if it determines that public response is significant An pertinent information is on fne and may be inspected and arrangements made for copying at
NORTHERN REGIONAL OFFICE
5515 Cherokee Ave . Suite 404
Alexandria. Virginia 22312
(703)750-9111 Following the comment period, the Board will make its determinations regarding the proposed issuance These determinations will become effective, unless the Board grants a public hearing. Due notice of any public hearing will be given The proposed reissuance consists of a permit containing final effluent limits, and a letter from the Executive Director State Water Control Board, which establishes interim effluent limits These interim effluent limits shall remain in effect until such time as construction grant monies are available and new facilities are constructed to meet the final effluent limits.
76.0%