Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 6 · column 1 of 6 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

a low rooi tnat nas yet to De tom down between the gymnasium and the classrooms will be replaced with a school house facade. It will extend out and become the main entrance. This will enlarge the central hallway connecting the two buildings making it lighter and more open.

What used to be the gymnasium is going to become the clothing department with dressing rooms added. Renovating this room is not a small job with its 21-foot ceiling. Workmen must use a scissors lift to patch, caulk and paint the ceiling and walls. Terry Foster, painting foreman, said the amount of dry wall and prep work was extensive. Still, work is progressing at a rapid pace.

95.5%