Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 16 · column 4 of 6 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

VDOT Hot Spots in

surrounding areas

You may exp'Wence delays and/or changes in traffic patterns due to road construction/maintenance activities that are scheduled in the coming weeks weather permitting. ,

Culpeper County

Route 3 (from Rte 522 to Rte 739 east of Stevensburg)

• Traffic may be reduced to one lane at times, controlled by flaggers.

Route 29 southbound (from Rte 666 to the Route 15 overpass)

• Paving operations all week, weather permitting.

Route 694 (from Rte 15/29 to Rte 229)

• Paving new lanes. Onelane traffic controlled by flaggers. Minor delays.

Route 711 (from Rte 630 to Rte 625)

• Grading and drainage. Traffic may be reduced to onelane controlled by flaggers.

Fauquier County

Route 15/29 northbound (from Rte 880 to the Rte 17 Flyover Bridge)

• Nighttime milling and paving operations scheduled for Sunday through Wednesday (Sept. 11-14) between the hours Of 7 p.m. and 4:00 a.m.

Route 880 (from Rte 15/29 to the College Road entrance)

• Paving operations scheduled for Thursday night (Sept. 15). Also paving the road into the Lord Fairfax Community College.

Route 635 (at Fiery Run)

• Widening operations at the bridge; traffic controlled

94.1%