Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 20 · column 4 of 6 · from the scan, no model involved

tween active solid waste disposal areas and the Stover site’s property lines.
• Daily and intermediate soil cover to be “excavated in areas adjacent to the intial disposal cell.”
• An erosion/sedimentation control pond downslope with a capacity for an area of approximately nine acres. The design also calls for erosion to be controlled and reduced with straw bales and siltation fences.
• Landfill gas monitoring program to be developed as part of the final design.
The memo Aug. 19 to Mr. Joyce also calls for fencing, with five or six strands of barbed wire, possible stretching 100 to 200 feet in each direction from the landfill’s access, gate, and a clear zone for fire protection of at least 75 feet from the active fill area to the nearest wooded
96.8%