Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.
Page 1 · column 4 of 5 · from the scan, no model involved

power instead from the Hazel switching station just inside the Culpeper County line near Boston. This small facility is a connecting point for Potomac Edison and VEPCO.
Now, REC is apparently considering a line from Sperryville to the Hazel switching station and and three routes from there to Rixeyville. Engineer Rick Bywaters has shown a map of the several alternative routes using the Boston facility to Natalie Emery, a landowner along the original route, and Robert Anderson, supervisor from StonewallHawthom District, which includes many of REC’s Rappahannock customers. Mr. Anderson said a map showing these routes is available at the REC Culpeper office.
See Power, Page A-8
78.7%