Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 3 · column 4 of 7 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

I he proposed site will include locations for two houses and a new septic system with drain field. One house is expected to be built sometime during 1989.

Draft environmental assessments are available for review at Shenandoah National Park Headquarters. Persons who wish to comment on this proposal or desire a copy of the assessment may write to: Superintendent, Shenandoah National Park, Route 4, Box 348, Luray 22835 or call (703) 999-2243.

76.1%