Block · one region of the page, as the scanner read it. It may hold a whole story, part of one, several, or an advertisement; stitching blocks into articles is the next step. Text is supplied OCR.

Page 19 · column 3 of 4 · from the scan, no model involved

The clipping this text was read from
The clipping this text was read from

/'■“DRAIN PIP HUB •Solid or perforated •Full line of fittings.avail.

IEP •Solid or perforated •Rigid P V.C. •2500 lb crush

V 4” x 100' coil

*19.95 4" x 250’ coil •ASTM approved for septic systems 4" x 10'

*3.65

80.6%